Solutions · Cement

Plastic-derived AFR for Cement Kilns

High-CV alternate fuel delivered to kiln spec, priced on heat value (Rs/Kcal), with audit-ready QA.

Cement kiln flame with AFR feed line

Why It Matters

  • Decarbonize without derating: consistent CV alternate engineered for co-processing.
  • Commercial clarity: heat-value indexed contracts (Rs/Kcal).
  • Compliance: traceability from feedstock to kiln gate with reporting.

What You Get: Spec & Delivery

  • Fuel engineering: CV bands; moisture and particle-size envelopes; ash/chlorine controls.
  • Supply assurance: multi-location sourcing, buffer stocks, scheduled deliveries.
  • Quality control: SOPs, batch CoAs, independent lab tie-ups; CV indexation for billing.

Commercial Models

  • Rs/Kcal contracting with CV-linked adjustment and lab arbitration.
  • Long-tenor offtake with phased multi-site ramp.
  • Performance pilots (30–90 days) prior to scale-up.

Operations & Compliance

  • Track-Trace-Audit dashboards for chain of custody.
  • EPR/CPCB documentation sets ready for audits.
  • Safety & storage SOPs for plant yards and handling.

Results & References

  • Cement Major (15-year) — heat-value indexed model, multi-site rollout; coal/petcoke displacement.
  • Regional pilots — kiln acceptability, flame stability, stack observations.
Get a spec-aligned quote and a pilot scope for your kiln lines.
Request a Heat-Value Quote

FAQ

Will this change our clinker quality?

We engineer CV/moisture and particle-size bands to your kiln spec and validate via pilots and stack observations.

How do you bill for CV variance?

Through Rs/Kcal indexation with agreed test frequency and lab arbitration protocol.