Solutions · Roads

Road Durability with Plastic‑Modified Bitumen

Controlled incorporation of processed waste plastics into bituminous mixes—validated in deployment with leading institutions.

Road laying crew; plastic-modified bitumen close‑up

Why This Works

  • Performance: improved rutting resistance and anti‑stripping; enhanced durability with controlled mixes.
  • Circular impact: diverts non‑recyclable plastics into long‑life infrastructure.
  • Proven: national highway deployment under institutional oversight.

Our Delivery Model

  • Material prep: cleaned, size‑controlled plastic feedstock with traceability.
  • Mix design: temperature windows, proportioning (% of bitumen), QA checkpoints in the JMF.
  • Site enablement: crew training, on‑site QA, documentation packs.

Quality & Compliance

  • CRRI‑aligned validation and test protocols.
  • Traceability pack (JMF, batch IDs, logs, photos, test results) for audits.

Deployment Proof

  • Highway pilot (e.g., Shivpuri–Jhansi) — standardized % incorporation in wearing course; post‑lay tracking.
  • Municipal roads — replication playbook for ULBs with local contractors.
Request the mix‑design playbook and QA checklist for your contractors.
Pilot a 1–3 km Stretch

FAQ

What percentage of plastic is typical?

We align to validated ranges and lock the % in the JMF; site temperature control is critical.

How do we source plastic consistently?

Through segregation, cleaning, and size‑grading operations with batch‑wise traceability.